How can we improve the TARGIT Decision Suite?

Multiple schedule

To minimize the amount of scheduled reports I miss a feature for setting multiple scheduling times for a single report. A lot of the reports we schedule both weekly and monthly, and now this has to be solved with creating one job for the weekly and one job for the monthly.

Now:
One schedule job for monday distribution.
One scheduled job for 1st each month.

Wish:
Schedule: Every monday and 1st each month.

8 votes
Vote
Sign in
Check!
(thinking…)
Reset
or sign in with
  • facebook
  • google
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    Svein shared this idea  ·   ·  Flag idea as inappropriate…  ·  Admin →

    0 comments

    Sign in
    Check!
    (thinking…)
    Reset
    or sign in with
    • facebook
    • google
      Password icon
      Signed in as (Sign out)
      Submitting...

      Feedback and Knowledge Base